(1) The name, address, and telephone number of the pipeline operator. (2) The specific location of the pipeline section to be tested and the location of the test equipment. (3) The date and time the test is to be conducted.

What is an MCA on pipeline?

Pipeline and Hazardous Materials Safety Administration (PHMSA)finally introduced new regulations in October 2019 around operators conducting integrity assessments outside of High Consequence Areas (HCA). These new areas are defined as Moderate Consequence Areas (MCA).

What is Pipe act?

The Protecting Our Infrastructure of Pipelines and Enhancing Safety Act of 2020 (“PIPES Act of 2020”) directs the Pipeline and Hazardous Materials Safety Administration (“PHMSA”) to promulgate regulations addressing a variety of pipeline safety issues.

What pipelines does Phmsa regulate?

Are gathering lines the only pipelines PHMSA regulates? No. PHMSA regulates more than 2.5 million miles of America’s pipeline network, which includes transmission and distribution pipelines, and has been working diligently to ensure that pipelines are operating as safely as possible.

What is PHMSA responsible for?

PHMSA is responsible for regulating and ensuring the safe and secure movement of hazardous materials to industry and consumers by all modes of transportation, including pipelines.

What is a final rule?

A final rule, in the context of administrative rulemaking, is a federal administrative regulation that advanced through the proposed rule and public comment stages of the rulemaking process and is published in the Federal Register with a scheduled effective date.

What is a moderate consequence area?

A “moderate consequence area” is an onshore area that is within a potential impact circle containing either five or more buildings intended for human occupancy or any portion of the paved surface, including shoulders, of a designated interstate, freeway, or expressway, or principal arterial roadway with four or more …

What is the difference between FERC and PHMSA?

PHMSA is responsible for standards governing the location and design of LNG facilities. FERC is responsible for determining whether proposed FERC-jurisdictional LNG facilities are in the public interest.

What is the difference between PHMSA and Fmcsa?

PHMSA highway transportation regulations apply only to motor carriers transporting hazmat in commerce. Some of these hazardous materials must be placarded, and some are excepted from placarding. FMCSA regulations focus on accidents involving large trucks and buses, including those that transport hazmat.

How is a final rule structured?

Structure. Final rules follow a specific format for publication in the Federal Register. The final rule begins with a preamble, which includes several subsections, continues with a statement of authority, and concludes with the full text of the measure.